Saturday 9 September 2017

Cabling Conclusion, and Switch Panel Installation

On Saturday, Adam was going to come around to do another afternoon of preparation work on Retro Rock-It... He arrived shortly after lunch time, just as Damian finished booking their accommodation for 2017!!


First up, Booger Mobile was using a switch panel with five holes in it - and only using three of the positions.  Damian decided to pilfer that for Retro Rock-It, and do something else for Booger Mobile post esCarpade...


Clearly the wiring was completed successfully, since the amber strobes are now working!!


And the switch panel is happily stuck to the top of the trip-meter.


And on with the rooftop pod...  After some slight adjustment to the position of the roof racks, the boys were able to bolt down the rooftop pod and connect the lights...  All working!!


On Sunday, Damian will be heading to the Brisbane Billycart Championships at Carindale to perform MC duties... this will be the grand unveiling of Retro Rock-It!!

0 comments:

Post a Comment